Resolve conflicting revisions before ordering material. Identify sensitive components, handling requirements and which assembly features cannot be evaluated by visual inspection.

Build data, component placement and inspection scope

Use the requirements below to prepare a focused project review. Confirm the work scope, acceptance criteria and responsibility for engineering changes in writing before production is released.

Information to include in your RFQ

  • Released BOM with manufacturer part numbers
  • Pick-and-place file with units and origin
  • Assembly drawing with polarity and no-fit references

Compare proposals on the same scope

Separate recurring unit cost from tooling, setup and test-development charges. Check what is included in inspection, traceability, packaging and disposition of nonconforming units. Ask which assumptions could change the quoted price or schedule.

Capability confirmation

[NEEDS CLIENT INPUT]: approved process capabilities, equipment, certificates, MOQ and available production lead times for this service.

These requirements describe a purchasing and engineering review, not a verified statement of factory capability.