A prototype should resolve technical uncertainty. Document deviations and component substitutions so that a successful bring-up can be traced back to the exact build configuration.

Plan what the first build needs to prove

Use the requirements below to prepare a focused project review. Confirm the work scope, acceptance criteria and responsibility for engineering changes in writing before production is released.

Information to include in your RFQ

  • Revision-controlled fabrication package
  • Bring-up sequence and debug access
  • Quantity split for testing and spares

Compare proposals on the same scope

Separate recurring unit cost from tooling, setup and test-development charges. Check what is included in inspection, traceability, packaging and disposition of nonconforming units. Ask which assumptions could change the quoted price or schedule.

Capability confirmation

[NEEDS CLIENT INPUT]: approved process capabilities, equipment, certificates, MOQ and available production lead times for this service.

These requirements describe a purchasing and engineering review, not a verified statement of factory capability.