A turnkey quote should explicitly include procurement responsibility. Compare purchased quantities, reel requirements, attrition allowance and material liability along with the assembly price.
Define who supplies each part of the build
Use the requirements below to prepare a focused project review. Confirm the work scope, acceptance criteria and responsibility for engineering changes in writing before production is released.
Information to include in your RFQ
- Approved vendor list and substitutes
- Ownership of excess and noncancelable material
- PCB fabrication and assembly revisions
Compare proposals on the same scope
Separate recurring unit cost from tooling, setup and test-development charges. Check what is included in inspection, traceability, packaging and disposition of nonconforming units. Ask which assumptions could change the quoted price or schedule.
Capability confirmation
[NEEDS CLIENT INPUT]: approved process capabilities, equipment, certificates, MOQ and available production lead times for this service.
These requirements describe a purchasing and engineering review, not a verified statement of factory capability.