A second soldering process can disturb an earlier assembly step. Plan support, selective solder access and thermal exposure across the entire build sequence.
Coordinate SMT and through-hole process sequences
Use the requirements below to prepare a focused project review. Confirm the work scope, acceptance criteria and responsibility for engineering changes in writing before production is released.
Information to include in your RFQ
- Assembly side and order constraints
- Heat-sensitive and tall components
- Solder alloy and cleaning compatibility
Compare proposals on the same scope
Separate recurring unit cost from tooling, setup and test-development charges. Check what is included in inspection, traceability, packaging and disposition of nonconforming units. Ask which assumptions could change the quoted price or schedule.
Capability confirmation
[NEEDS CLIENT INPUT]: approved process capabilities, equipment, certificates, MOQ and available production lead times for this service.
These requirements describe a purchasing and engineering review, not a verified statement of factory capability.