Define the design constraints before routing. Stackup, return paths, component placement and test access are interdependent decisions; changing one late can invalidate earlier checks.
Connect electrical intent to a buildable physical design
Use the requirements below to prepare a focused project review. Confirm the work scope, acceptance criteria and responsibility for engineering changes in writing before production is released.
Information to include in your RFQ
- Schematic and connectivity rules
- Mechanical outline and keepouts
- Impedance, power and signal-integrity constraints
Compare proposals on the same scope
Separate recurring unit cost from tooling, setup and test-development charges. Check what is included in inspection, traceability, packaging and disposition of nonconforming units. Ask which assumptions could change the quoted price or schedule.
Capability confirmation
[NEEDS CLIENT INPUT]: approved process capabilities, equipment, certificates, MOQ and available production lead times for this service.
These requirements describe a purchasing and engineering review, not a verified statement of factory capability.